The biggest event is the "improvement" of Highway 20 just north of the old Skagit Steel property. There will be a traffic round (!) creating an intersection at the north end of that industrial park and just west of the Les Schwab Tire store. All summer, truckers have been cutting through downtown to avoid the flaggers. Starting yesterday, that section of Highway 20 is closed for the final push and there is an actual detour through town. The little section is scheduled to be closed from Sept. 9th to 23rd, and the contractors placed big digital signs at both ends of the construction zone to make the announcement well in advance. Unfortunately, some people interpreted this to mean that the entire North Cascades Highway would be closed from Sedro-Woolley eastward. And that tidbit has already made the papers. The WA State DOT is sending out disclaimers. It's just the section where the traffic round is being installed that is closed. See two photos below.
The McGargile Road is also torn up and being refitted with sidewalks, curbs, a bike trail, and resufacing. This has caused a major detour for people who live north of Highway 20 towards the old Northern State Hospital. McGargile is the road that goes east off of Highway 9, just past Cascade Middle School and past Evergreen Elementary. It connects with Fruitdale Road at the east end. It is all but impassable for the locals. Below is a photo, taken from where Carter Road intersects with McGargile. There is also road work on Fruitdale between McGargile and Highway 20. You can imagine the creative routes that local folks need to take to get to work and back every day. When all is done, kids will have a much safer way to walk and bike to school.
BTW, Federal stimulus money is paying for part of both of these road projects.
Skagit State Bank at Ferry and Murdock Streets is getting a big facelift and some office space changes inside. Big project - the rock surface had to be removed and staged for reuse, then all the construction completed. The bank has been open during everything - the folks who work there are good sports, but I will tell you that going inside is like going into the Bat Cave. It's kind of exciting. See photo below taken from their drive thru point.
Just north of the bank on Murdock, the same contractor is building a large commercial building of some kind. I don't know who will be in it. I should be nosier, I guess. Photo below.
Finally, we had some work done on our front porch to replace the decking and some walls on this 111 year-old structure. Every so often you need to replace old wood. See photos. And next door, at the home formerly owned by the Foss family, the entire front porch is being replaced. No photo..
There are other projects going on around town, racing toward finish to beat the turn of the weather. We're scheduled for sunny, warm days through about next Friday. Then some rain and maybe our lawns will green up!
Highway 20 in front of Les Schwab.
Highway 20 - detour at the new traffic round (no, I'm not driving on the wrong side).
On Carter Rd. looking north to McGargile.
Skagit State Bank remodel.
Freshening up the front porch.
Fine work by Wild Ass Milling and Construction.